Train 1W31 London Paddington to Great Malvern

Operated By GWR

d. 1552

p. 1553

p. 1554

p. 1555

p. 1557

p. 1559

p. 1600

p. 1604

p. 1607

Twyford

1min Eng. Allowance

Plat 1 ML

p. 1610

p. 1613

a. 1615

d. 1619

p. 1620

Goring & Streatley

1min Eng. Allowance
1min Pathing Allowance

ML

p. 1625

Didcot East Jn

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

p. 1631

p. 1632

p. 1638

Hinksey North

1min Eng. Allowance

p. 1639

a. 1642

d. 1645

p. 1648

a. 1653

d. 1654

a. 1700

d. 1702

p. 1705

a. 1709

d. 1711

a. 1717

d. 1719

a. 1729

d. 1730

a. 1736

d. 1738

Pershore

1min Eng. Allowance

a. 1743

d. 1745

a. 1750

d. 1752

p. 1753

p. 1756

a. 1758

d. 1810

a. 1811

d. 1813

Henwick

4min Pathing Allowance

p. 1815

p. 1823

a. 1825

d. 1826

a. 1829

Schedule Info

Departing Sat 27/04/2024
Created Wed 06/09/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID G82675 (7145267)
Schedule Type WTT
Duration 02 hrs 37 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7543

Passenger Info

Member Info Log In