Train 1L82 Cheltenham Spa to London Paddington

Operated By GWR

d. 1559

p. 1605

p. 1606

Gloucester

Driver Changes Ends

a. 1608

d. 1616

p. 1617

p. 1618

p. 1625

a. 1627

d. 1628

a. 1632

d. 1633

p. 1638

Kemble

1min Eng. Allowance

a. 1647

d. 1649

p. 1659

Swindon

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

a. 1701

d. 1704

p. 1710

p. 1712

Wantage Road

1min Eng. Allowance

p. 1713

a. 1719

d. 1721

Goring & Streatley

1min Eng. Allowance

ML

p. 1726

p. 1732

a. 1733

d. 1735

p. 1736

p. 1739

p. 1743

p. 1746

p. 1749

p. 1749

p. 1750

Acton West

1min Eng. Allowance

ML

p. 1752

p. 1755

Portobello Jn (London)

1min Pathing Allowance

3

p. 1756

p. 1758

a. 1759

Schedule Info

Departing Sat 27/04/2024
Created Wed 06/09/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID G82553 (7145145)
Schedule Type WTT
Duration 02 hrs 00 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25390003
Flow Info London - Cheltenham
Service ID 3620

Passenger Info

Member Info Log In