Train 9W90 Paddington Crossrail to Shenfield

Operated By Crossrail

d. 2252

a. 2254

d. 2255

a. 2256

d. 2257

a. 2259

d. 2300

a. 2302

d. 2303

a. 2305

d. 2305

p. 2306

p. 2309

Stratford

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

Plat 8 EL

a. 2310

d. 2311

a. 2313

d. 2313

a. 2315

d. 2315

p. 2316

a. 2317

d. 2318

a. 2320

d. 2321

a. 2323

d. 2323

a. 2325

d. 2325

a. 2327

d. 2327

a. 2330

d. 2331

a. 2333

d. 2335

a. 2338

d. 2338

Brentwood

1min Pathing Allowance

a. 2342

d. 2343

a. 2348

Schedule Info

Departing Thu 28/03/2024
Created Fri 01/12/23 21:02
Validity 11/12/23 until 31/05/2024
Schedule ID G80238 (8026550)
Schedule Type WTT
Duration 00 hrs 56 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In