Train 9U91 Maidenhead to Abbey Wood (Crossrail)

Operated By Crossrail

d. 1359

a. 1403

d. 1403

a. 1406

d. 1407

a. 1410

d. 1411

a. 1413

d. 1413

a. 1415

d. 1416

p. 1418

a. 1419

d. 1420

Southall

1min Pathing Allowance

Plat 4 RL

a. 1423

d. 1423

p. 1426

a. 1428

d. 1429

Acton West

1min Eng. Allowance
1min Pathing Allowance

RL

p. 1430

p. 1435

p. 1436

p. 1437

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1439

d. 1441

a. 1443

d. 1444

a. 1445

d. 1446

a. 1448

d. 1449

a. 1451

d. 1452

a. 1454

d. 1454

p. 1455

a. 1457

d. 1458

a. 1501

d. 1502

a. 1506

d. 1507

p. 1509

a. 1511

Schedule Info

Departing Thu 28/03/2024
Created Fri 01/12/23 21:02
Validity 11/12/23 until 31/05/2024
Schedule ID G79913 (8026530)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381001
Flow Info London Liverpool St - Shenfield (Off Peak)

Passenger Info

Member Info Log In