Train 9U75 Maidenhead to Abbey Wood (Crossrail)

Operated By Crossrail

d. 2130

a. 2134

d. 2134

a. 2137

d. 2138

a. 2141

d. 2142

a. 2144

d. 2144

West Drayton

1min Performance Allowance

a. 2146

d. 2147

p. 2150

a. 2151

d. 2152

a. 2154

d. 2155

p. 2157

a. 2158

d. 2200

Acton West

1min Eng. Allowance

RL

p. 2201

p. 2205

p. 2206

p. 2207

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 2209

d. 2211

a. 2213

d. 2214

a. 2215

d. 2216

a. 2218

d. 2219

a. 2221

d. 2222

a. 2224

d. 2224

p. 2225

a. 2227

d. 2228

a. 2231

d. 2232

a. 2236

d. 2237

p. 2239

a. 2241

Schedule Info

Departing Thu 28/03/2024
Created Fri 01/12/23 21:02
Validity 11/12/23 until 31/05/2024
Schedule ID G79903 (8026520)
Schedule Type WTT
Duration 01 hrs 11 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381001
Flow Info London Liverpool St - Shenfield (Off Peak)

Passenger Info

Member Info Log In