Train 9N90 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

d. 1232

p. 1233

a. 1235

d. 1235

a. 1239

d. 1239

a. 1242

d. 1243

p. 1245

a. 1246

d. 1247

a. 1249

d. 1250

a. 1252

d. 1253

a. 1255

d. 1256

a. 1257

d. 1258

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1301

d. 1302

p. 1304

p. 1305

p. 1306

p. 1309

a. 1310

d. 1311

p. 1312

a. 1315

d. 1315

a. 1318

d. 1319

p. 1320

a. 1322

d. 1322

a. 1324

d. 1325

Langley

1min Pathing Allowance

a. 1327

d. 1327

a. 1332

d. 1333

Burnham

1min Eng. Allowance

a. 1336

d. 1336

a. 1342

Schedule Info

Departing Fri 29/03/2024
Created Wed 15/11/23 20:40
Validity 11/12/23 until 31/05/2024
Schedule ID G79547 (7843302)
Schedule Type WTT
Duration 01 hrs 10 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In