Train 9N30 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

d. 1900

p. 1901

a. 1903

d. 1903

a. 1907

d. 1907

a. 1910

d. 1911

p. 1913

a. 1914

d. 1915

a. 1917

d. 1918

a. 1920

d. 1921

a. 1923

d. 1924

a. 1925

d. 1926

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1929

d. 1930

p. 1932

p. 1933

p. 1934

p. 1937

a. 1938

d. 1941

p. 1942

a. 1945

d. 1945

a. 1948

d. 1949

p. 1950

a. 1952

d. 1952

a. 1954

d. 1955

a. 1957

d. 1957

a. 2000

d. 2001

Burnham

1min Eng. Allowance

a. 2004

d. 2005

a. 2010

Schedule Info

Departing Thu 28/03/2024
Created Tue 15/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID G79500 (6843671)
Schedule Type WTT
Duration 01 hrs 10 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In