Train 9N20 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

d. 1827

p. 1828

a. 1830

d. 1831

a. 1835

d. 1835

a. 1838

d. 1841

p. 1843

a. 1844

d. 1845

a. 1847

d. 1848

a. 1850

d. 1851

a. 1853

d. 1854

a. 1855

d. 1856

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1859

d. 1900

p. 1902

p. 1903

p. 1904

p. 1907

a. 1908

d. 1909

West Ealing

2min Pathing Allowance

Plat 3 RL

p. 1910

a. 1915

d. 1915

a. 1918

d. 1919

p. 1920

a. 1922

d. 1922

a. 1924

d. 1925

a. 1927

d. 1927

a. 1930

d. 1931

Burnham

1min Pathing Allowance

a. 1934

d. 1935

Taplow

1min Eng. Allowance
1min Pathing Allowance

a. 1938

d. 1938

a. 1943

Schedule Info

Departing Fri 29/03/2024
Created Fri 01/12/23 21:02
Validity 11/12/23 until 31/05/2024
Schedule ID G79492 (8026455)
Schedule Type WTT
Duration 01 hrs 16 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In