Train 9N08 Abbey Wood (Crossrail) to Maidenhead

Operated By Crossrail

d. 1502

p. 1503

a. 1505

d. 1505

a. 1509

d. 1509

a. 1512

d. 1513

p. 1515

a. 1516

d. 1517

a. 1519

d. 1520

a. 1522

d. 1523

a. 1525

d. 1526

a. 1527

d. 1528

Paddington Crossrail

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 1531

d. 1532

p. 1533

p. 1534

Ladbroke Grove

1min Pathing Allowance

RL

p. 1535

p. 1539

a. 1540

d. 1541

p. 1542

a. 1545

d. 1545

a. 1548

d. 1549

p. 1550

a. 1552

d. 1552

a. 1554

d. 1555

a. 1557

d. 1557

a. 1600

d. 1601

Burnham

1min Eng. Allowance

a. 1604

d. 1605

a. 1610

Schedule Info

Departing Sat 27/04/2024
Created Wed 15/11/23 20:40
Validity 16/12/23 until 01/06/2024
Schedule ID G79483 (7843938)
Schedule Type WTT
Duration 01 hrs 08 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381901
Flow Info Normal Services

Passenger Info

Member Info Log In