Train 2Y15 Heathrow Terminal 5 to London Paddington

Operated By Crossrail

d. 0007

a. 0010

d. 0012

p. 0015

Stockley Junction

2min Pathing Allowance

RL

p. 0015

p. 0019

Hayes & Harlington

Electric Power From Here
Speed Increase to 90mph
Timed for 345 tonnes from here

a. 0020

d. 0021

a. 0023

d. 0024

p. 0026

a. 0027

d. 0028

Acton West

1min Eng. Allowance

RL

p. 0029

p. 0033

p. 0034

p. 0035

a. 0037

Schedule Info

Departing Thu 28/03/2024
Created Tue 15/08/23 00:10
Validity 12/12/23 until 01/06/2024
Schedule ID G79379 (6848306)
Schedule Type WTT
Duration 00 hrs 30 mins

Train Info

Operated By Crossrail
Timed For 90mph
Power Type EMU
Timing Load Class 345
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 21381202
Flow Info Normal Services

Passenger Info

Member Info Log In