Train 9T48 Brighton to Bedford

Operated By Thameslink

d. 1658

a. 1701

d. 1702

a. 1708

d. 1708

a. 1711

d. 1712

p. 1713

a. 1713

d. 1714

a. 1718

d. 1719

p. 1721

a. 1724

d. 1725

p. 1728

a. 1730

d. 1731

a. 1735

d. 1736

p. 1741

p. 1746

p. 1747

a. 1750

d. 1751

p. 1752

p. 1756

Blue Anchor (Kent)

1min Performance Allowance

5

p. 1801

a. 1804

d. 1806

Metropolitan Jn

1min Performance Allowance

p. 1807

p. 1810

a. 1811

d. 1812

a. 1813

d. 1814

a. 1815

d. 1816

St Pancras International

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here
1min Performance Allowance

a. 1820

d. 1821

p. 1823

p. 1825

p. 1826

p. 1830

p. 1835

a. 1839

d. 1841

p. 1846

a. 1847

d. 1848

Luton Airport Parkway

1min Eng. Allowance

a. 1852

d. 1853

a. 1856

d. 1857

a. 1900

d. 1901

p. 1902

a. 1905

d. 1906

a. 1909

d. 1910

Bedford South Jn.

1min Eng. Allowance

USL

p. 1917

Bedford

Then Forming 5Y48

a. 1922

Schedule Info

Departing Tue 09/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G50803 (8828833)
Schedule Type WTT
Duration 02 hrs 24 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22721000
Flow Info Thameslink Mainline South (Brighton-Bedford)

Passenger Info

Member Info Log In