Train 9T48 Brighton to Bedford

Operated By Thameslink

d. 1728

a. 1731

d. 1732

a. 1738

d. 1738

a. 1741

d. 1742

p. 1743

a. 1743

d. 1744

a. 1748

d. 1749

p. 1751

a. 1754

d. 1755

p. 1758

a. 1800

d. 1801

a. 1805

d. 1806

p. 1811

p. 1816

p. 1817

a. 1820

d. 1821

p. 1822

p. 1823

p. 1824

p. 1826

p. 1829

p. 1830

Blue Anchor (Kent)

1min Performance Allowance

5

p. 1831

a. 1834

d. 1836

Metropolitan Jn

1min Performance Allowance

p. 1837

p. 1840

a. 1841

d. 1842

a. 1843

d. 1844

a. 1845

d. 1846

St Pancras International

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here
1min Performance Allowance

a. 1850

d. 1851

p. 1853

p. 1855

p. 1856

a. 1859

d. 1859

p. 1901

p. 1902

p. 1906

a. 1910

d. 1911

p. 1916

a. 1917

d. 1917

Luton Airport Parkway

1min Eng. Allowance

a. 1922

d. 1923

a. 1926

d. 1927

a. 1930

d. 1931

p. 1932

a. 1935

d. 1936

Flitwick

1min Performance Allowance

a. 1939

d. 1940

Bedford South Jn.

1min Eng. Allowance

DSL

p. 1948

Bedford

Then Forming 5Y48

a. 1952

Schedule Info

Departing Sat 27/07/2024
Created Tue 20/02/24 20:43
Validity 08/06/24 until 14/12/2024
Schedule ID G50802 (8840200)
Schedule Type WTT
Duration 02 hrs 24 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22721000
Flow Info Thameslink Mainline South (Brighton-Bedford)

Passenger Info

Member Info Log In