Train 5T73 Brighton to Three Bridges Tl Up Depot

Operated By Thameslink

d. 0110

p. 0113

p. 0119

Keymer Jn

1min Pathing Allowance

p. 0119

p. 0123

p. 0124

p. 0129

Three Bridges Signal T288

Stops For Operating Reasons

a. 0131

d. 0131

a. 0142

Schedule Info

Departing Sat 27/07/2024
Created Tue 20/02/24 20:43
Validity 04/06/24 until 14/12/2024
Schedule ID G49324 (8834152)
Schedule Type WTT
Duration 00 hrs 32 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 22788002
Flow Info Thameslink Empty Coach Stock Movements
Member Info Log In