Train 2G91 Westbury to Cheltenham Spa

Operated By GWR

d. 2006

p. 2007

a. 2011

d. 2012

p. 2015

a. 2021

d. 2022

p. 2027

p. 2028

Chippenham

1min Pathing Allowance

a. 2031

d. 2032

Wootton Bassett Jn

1min Eng. Allowance
1min Pathing Allowance

p. 2042

Swindon

Driver Changes Ends
Diesel Power From Here
Speed Increase to 90mph
Timed for E tonnes from here

a. 2050

d. 2054

p. 2056

a. 2106

d. 2107

p. 2116

a. 2121

d. 2122

Stonehouse

1min Eng. Allowance

a. 2126

d. 2127

Standish Jn

1min Eng. Allowance

p. 2131

p. 2138

p. 2140

Gloucester

Driver Changes Ends

a. 2141

d. 2157

p. 2158

p. 2159

a. 2205

Schedule Info

Departing Thu 11/07/2024
Created Wed 10/04/24 19:40
Validity 03/06/24 until 13/12/2024
Schedule ID G45223 (9257530)
Schedule Type WTT
Duration 01 hrs 59 mins

Train Info

Operated By GWR
Timed For 90mph
Power Type DMU
Timing Load Class 158 - 175
Service Type Passenger Service (OO)
Service Code 25485001
Flow Info Swindon - Westbury

Passenger Info

Member Info Log In