Train 1B09 London Paddington to Carmarthen

Operated By GWR

p. 0949

p. 0951

p. 0953

p. 0955

p. 0956

p. 1000

p. 1003

Twyford

1min Eng. Allowance

Plat 1 ML

p. 1006

p. 1009

a. 1011

d. 1013

Goring & Streatley

1min Eng. Allowance

ML

p. 1019

p. 1028

p. 1030

Uffington (Oxfordshire)

1min Eng. Allowance
1min Pathing Allowance

p. 1031

a. 1039

d. 1042

Hullavington

1min Eng. Allowance

p. 1053

p. 1100

a. 1103

d. 1105

p. 1106

p. 1109

p. 1121

a. 1122

d. 1124

p. 1127

Marshfield

1min Eng. Allowance

p. 1129

p. 1134

Cardiff Central

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

Plat 3 D

a. 1136

d. 1139

p. 1150

a. 1158

d. 1159

p. 1204

p. 1207

a. 1210

d. 1211

p. 1215

Neath

1min Eng. Allowance

a. 1217

d. 1219

Swansea

Stops to Uncouple Vehicles
Driver Changes Ends
Trolley Service Ends Here
Divides Forming 1L22

a. 1230

d. 1241

p. 1250

p. 1253

a. 1255

d. 1256

a. 1301

d. 1303

p. 1308

Ferryside

1min Eng. Allowance

p. 1312

p. 1321

a. 1325

Schedule Info

Departing Thu 11/07/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G44760 (8789652)
Schedule Type WTT
Duration 03 hrs 37 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25375002
Flow Info London - Cardiff/Swansea
Service ID 6313

Passenger Info

Member Info Log In