Train 1W13 London Paddington to Great Malvern

Operated By GWR

p. 0651

p. 0653

p. 0655

p. 0657

p. 0658

p. 0702

p. 0705

Twyford

1min Eng. Allowance

Plat 1 ML

p. 0708

p. 0711

a. 0713

d. 0718

Goring & Streatley

1min Eng. Allowance
1min Pathing Allowance

ML

p. 0724

Didcot East Jn

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

p. 0731

p. 0733

p. 0739

Hinksey North

1min Eng. Allowance
1min Pathing Allowance

p. 0740

a. 0744

d. 0748

p. 0752

a. 0756

d. 0758

a. 0804

d. 0805

a. 0813

d. 0814

a. 0821

d. 0822

a. 0832

d. 0834

a. 0839

d. 0841

Pershore

1min Eng. Allowance

a. 0846

d. 0848

a. 0853

d. 0856

p. 0857

Worcester Wylds Lane Jn

1min Pathing Allowance

p. 0901

a. 0904

d. 0915

p. 0919

a. 0925

d. 0927

a. 0929

Schedule Info

Departing Thu 05/09/2024
Created Mon 08/04/24 19:40
Validity 03/06/24 until 13/12/2024
Schedule ID G44653 (9248762)
Schedule Type WTT
Duration 02 hrs 39 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7307

Passenger Info

Member Info Log In