Train 1W41 London Paddington to Great Malvern

Operated By GWR

p. 2053

p. 2055

p. 2057

p. 2059

p. 2100

p. 2104

p. 2107

Twyford

1min Eng. Allowance

Plat 1 ML

p. 2110

Kennet Bridge Jn

1min Pathing Allowance

DML

p. 2113

a. 2116

d. 2118

Goring & Streatley

1min Eng. Allowance
1min Pathing Allowance

ML

p. 2124

Didcot East Jn

Diesel Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here
Trolley Service Available

p. 2131

p. 2132

p. 2138

Hinksey North

1min Eng. Allowance

p. 2139

Oxford

Trolley Service Ends Here

Plat 4 DML

a. 2142

d. 2144

p. 2148

a. 2153

d. 2154

a. 2200

d. 2201

a. 2209

d. 2210

a. 2217

d. 2218

a. 2228

d. 2229

a. 2235

d. 2236

Pershore

1min Eng. Allowance

a. 2242

d. 2243

a. 2248

d. 2250

p. 2251

a. 2257

d. 2258

p. 2303

a. 2309

d. 2310

a. 2313

Schedule Info

Departing Fri 12/07/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G44631 (8789542)
Schedule Type WTT
Duration 02 hrs 21 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type EMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25392003
Flow Info London - Worcester/Hereford
Service ID 7363

Passenger Info

Member Info Log In