Train 1L92 Cheltenham Spa to London Paddington

Operated By GWR

p. 2105

p. 2106

Gloucester

Driver Changes Ends

a. 2108

d. 2118

p. 2119

p. 2126

a. 2128

d. 2129

a. 2133

d. 2134

Kemble

1min Eng. Allowance

a. 2148

d. 2149

Swindon

Electric Power From Here
Speed Increase to 125mph
Timed for 802 tonnes from here

a. 2202

d. 2204

p. 2212

Wantage Road

1min Eng. Allowance

p. 2213

a. 2219

d. 2220

Goring & Streatley

1min Eng. Allowance

ML

p. 2226

a. 2233

d. 2235

p. 2236

p. 2239

p. 2242

p. 2245

p. 2248

Heathrow Airport Jn

3min Pathing Allowance

ML

p. 2249

p. 2253

Acton West

1min Eng. Allowance

ML

p. 2255

p. 2258

p. 2300

Schedule Info

Departing Tue 03/09/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G44618 (8789530)
Schedule Type WTT
Duration 02 hrs 02 mins

Train Info

Operated By GWR
Timed For 125mph
Power Type DMU
Timing Load Class 802
Service Type Express Passenger (XX)
Service Code 25390003
Flow Info London - Cheltenham
Service ID 3432

Passenger Info

Member Info Log In