Train 1Y33 Leeds to Nottingham

Operated By Northern

Leeds

Formed from 2T28

d. 2005

p. 2006

p. 2007

p. 2010

p. 2014

p. 2016

a. 2021

d. 2022

p. 2025

Woolley Coal Sdgs S.B.

1min Performance Allowance

p. 2030

a. 2036

d. 2037

p. 2047

a. 2050

d. 2051

Wincobank Jn.

1min Performance Allowance
1min Eng. Allowance

p. 2052

p. 2058

a. 2100

d. 2104

p. 2109

a. 2113

d. 2114

p. 2118

a. 2119

d. 2120

p. 2121

p. 2123

a. 2129

d. 2130

p. 2133

a. 2136

d. 2137

Ilkeston

1min Eng. Allowance

a. 2141

d. 2142

p. 2146

Radford Jn

3min Pathing Allowance

UM

p. 2151

p. 2156

Nottingham

Then Forming 1Y36

a. 2159

Schedule Info

Departing Tue 11/06/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G32099 (8786580)
Schedule Type WTT
Duration 01 hrs 54 mins

Train Info

Operated By Northern
Timed For 100mph
Power Type DMU
Timing Load Class 195
Service Type Express Passenger (XX)
Service Code 21865000
Flow Info Nottingham - Sheffield - Leeds
Service ID 1179

Passenger Info

Member Info Log In