Train 3K07 London Kings Cross to Welwyn Garden City

Operated By Thameslink

London Kings Cross

Formed from 2Y03

Plat 3 CX

d. 0544

p. 0546

p. 0547

Finsbury Park

5min Pathing Allowance

Plat 7 SL1

p. 0548

Alexandra Palace

6min Pathing Allowance

Plat 3 SL

p. 0556

Potters Bar

1min Eng. Allowance

p. 0608

a. 0617

Schedule Info

Departing Thu 28/03/2024
Created Wed 16/08/23 00:10
Validity 11/12/23 until 31/05/2024
Schedule ID G22600 (6869514)
Schedule Type WTT
Duration 00 hrs 33 mins

Train Info

Operated By Thameslink
Timed For 75mph
Power Type EMU
Timing Load Class 717
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Service Code 21788001
Flow Info GN Empty Coaching Stock Movements
Member Info Log In