Train 9T50 Brighton to Bedford

Operated By Thameslink

d. 1758

a. 1801

d. 1802

a. 1808

d. 1808

a. 1811

d. 1812

p. 1813

a. 1813

d. 1814

a. 1818

d. 1819

p. 1821

a. 1824

d. 1825

p. 1828

a. 1830

d. 1831

a. 1835

d. 1836

p. 1841

p. 1846

p. 1847

a. 1850

d. 1851

p. 1852

p. 1853

p. 1854

p. 1856

p. 1859

p. 1900

Blue Anchor (Kent)

1min Performance Allowance

5

p. 1901

a. 1904

d. 1906

Metropolitan Jn

1min Performance Allowance

p. 1907

p. 1910

a. 1911

d. 1912

a. 1913

d. 1914

a. 1915

d. 1916

St Pancras International

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here
1min Performance Allowance

a. 1920

d. 1921

p. 1923

p. 1925

p. 1926

a. 1929

d. 1929

p. 1931

p. 1932

p. 1936

a. 1940

d. 1941

p. 1946

a. 1947

d. 1947

Luton Airport Parkway

1min Eng. Allowance

a. 1952

d. 1953

a. 1956

d. 1957

a. 2000

d. 2001

p. 2002

a. 2005

d. 2006

Flitwick

1min Performance Allowance

a. 2009

d. 2010

Bedford South Jn.

1min Eng. Allowance

DSL

p. 2018

a. 2022

Schedule Info

Departing Sat 27/04/2024
Created Wed 16/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID G22245 (6878442)
Schedule Type WTT
Duration 02 hrs 24 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22721000
Flow Info Thameslink Mainline South (Brighton-Bedford)

Passenger Info

Member Info Log In