Train 9B76 Crystal Palace to Highbury And Islington Ell

Operated By London Overground

a. 2353

d. 2354

a. 2356

d. 2356

a. 2358

d. 2359

a. 0001

d. 0001

New Cross Gate

Electric Power From Here
Speed Increase to 75mph
Timed for 378 tonnes from here

a. 0003

d. 0004

a. 0008

d. 0009

a. 0010

d. 0011

a. 0012

d. 0012

a. 0013

d. 0014

a. 0015

d. 0016

a. 0017

d. 0018

a. 0022

d. 0023

a. 0024

d. 0025

a. 0029

d. 0030

Schedule Info

Departing Sat 05/07/2025
Created Thu 16/01/25 22:01
Validity 24/05/25 until 20/09/2025
Schedule ID G19821 (11623490)
Schedule Type WTT
Duration 00 hrs 42 mins

Train Info

Operated By London Overground
Timed For 75mph
Power Type EMU
Timing Load Class 378
Service Type Passenger Service (OO)
Characteristics Driver Only Operated (DOO)
Service Code 22215003
Flow Info ELL : Network Rail Infrastructure only - (New X Gate-C Palace/W Croydon)

Passenger Info

Member Info Log In