Train 2E80 Ipswich to Peterborough

Operated By Greater Anglia

d. 1558

p. 1600

p. 1600

Stowmarket

Diesel Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 1608

d. 1609

Haughley Jn

1min Eng. Allowance

p. 1612

a. 1625

d. 1629

p. 1638

Chippenham Jn

2min Pathing Allowance

p. 1641

Soham

1min Eng. Allowance

a. 1649

d. 1650

p. 1658

a. 1659

d. 1700

p. 1703

p. 1707

p. 1708

a. 1711

d. 1712

p. 1714

March South Signal Ms933

1min Eng. Allowance

p. 1715

a. 1719

d. 1720

p. 1721

p. 1726

p. 1728

a. 1730

d. 1731

Kings Dyke

1min Eng. Allowance

p. 1734

p. 1738

Peterborough

Then Forming 2L81

a. 1740

Schedule Info

Departing Sat 27/04/2024
Created Fri 25/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID G18148 (7051534)
Schedule Type WTT
Duration 01 hrs 42 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type EMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In