Train 2A48 Cambridge to Harwich International

Operated By Greater Anglia

d. 1947

p. 1949

a. 2002

d. 2003

a. 2007

d. 2008

p. 2012

Kennett

1min Eng. Allowance

p. 2015

a. 2025

d. 2026

a. 2031

d. 2032

a. 2037

d. 2038

p. 2042

Stowmarket

Electric Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 2045

d. 2046

Needham Market

1min Eng. Allowance

a. 2050

d. 2050

p. 2056

p. 2057

a. 2100

d. 2101

p. 2102

p. 2110

p. 2111

Parkeston Goods Junction

1min Eng. Allowance

p. 2121

a. 2124

Schedule Info

Departing Sat 27/04/2024
Created Sat 19/08/23 00:10
Validity 16/12/23 until 01/06/2024
Schedule ID G17975 (6976096)
Schedule Type WTT
Duration 01 hrs 37 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type DMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In