Train 2U21 Northampton to Crewe

Operated By WMT

Northampton

Formed from 2Y32

d. 0601

a. 0611

d. 0612

Daventry North Jn

1min Eng. Allowance

p. 0617

p. 0620

a. 0622

d. 0624

p. 0628

a. 0635

d. 0637

Atherstone

Electric Power From Here
Speed Increase to 100mph
Timed for 350 tonnes from here

a. 0642

d. 0643

a. 0647

d. 0648

p. 0650

Tamworth Low Level

Speed Increase to 110mph
Timed for 506 tonnes from here

a. 0652

d. 0653

a. 0705

d. 0706

Rugeley North Jn

1min Eng. Allowance
1min Pathing Allowance

SL

p. 0707

FL

p. 0711

a. 0716

d. 0717

p. 0722

Madeley (Staffs)

1min Eng. Allowance
1min Pathing Allowance

FL

p. 0728

a. 0740

Schedule Info

Departing Tue 11/06/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID C78404 (8825242)
Schedule Type WTT
Duration 01 hrs 39 mins

Train Info

Operated By WMT
Timed For 110mph
Power Type EMU
Timing Load Class 350
Service Type Passenger Service (OO)
Service Code 22330000
Flow Info Rugby/Coventry-Nuneaton-Stafford-Crewe/Stoke On Trent
Service ID 1005

Passenger Info

Member Info Log In