Train 2E76 Ipswich to Peterborough

Operated By Greater Anglia

d. 1156

p. 1200

Stowmarket

Diesel Power From Here
Speed Increase to 100mph
Timed for 755 tonnes from here

a. 1206

d. 1207

Haughley Jn

1min Eng. Allowance

p. 1211

a. 1223

d. 1228

p. 1237

Chippenham Jn

2min Pathing Allowance

p. 1240

Soham

1min Eng. Allowance

a. 1250

d. 1251

p. 1258

a. 1259

d. 1300

p. 1302

a. 1310

d. 1311

p. 1313

March South Signal Ms933

1min Eng. Allowance

p. 1315

a. 1319

d. 1320

p. 1321

a. 1330

d. 1331

Kings Dyke

1min Eng. Allowance

p. 1333

Peterborough

Then Forming 2L77

a. 1340

Schedule Info

Departing Thu 13/03/2025
Created Tue 18/02/25 21:21
Validity 16/12/24 until 16/05/2025
Schedule ID C65592 (11963200)
Schedule Type WTT
Duration 01 hrs 44 mins

Train Info

Operated By Greater Anglia
Timed For 100mph
Power Type EMU
Timing Load Class 755
Service Type Passenger Service (OO)
Service Code 21894002
Flow Info Harwich P Quay - Bury St Edmonds/Cambridge/Peterborough

Passenger Info

Member Info Log In