Train 2A29 Matlock to Nottingham

Operated By East Midlands Railway

d. 1415

a. 1417

d. 1417

a. 1419

d. 1420

a. 1425

d. 1425

a. 1429

d. 1431

p. 1433

a. 1435

d. 1436

a. 1440

d. 1440

St.Mary'S South Junction

1min Pathing Allowance

C

p. 1445

Derby

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

Plat 5 DM

a. 1448

d. 1450

p. 1453

a. 1458

d. 1459

p. 1500

p. 1502

Down Trent Loop

Booked To Wait

a. 1503

d. 1504

a. 1506

d. 1507

a. 1510

d. 1511

Beeston South Jn

1min Eng. Allowance

DNF

p. 1513

p. 1516

Nottingham

Then Forming C60821

a. 1518

Schedule Info

Departing Thu 11/07/2024
Created Tue 16/04/24 19:41
Validity 03/06/24 until 13/12/2024
Schedule ID C60815 (9292583)
Schedule Type WTT
Duration 01 hrs 03 mins

Train Info

Operated By East Midlands Railway
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 22323000
Flow Info Derby - Matlock
Service ID 5329

Passenger Info

Member Info Log In