Train 2A18 Nottingham to Matlock

Operated By East Midlands Railway

Nottingham

Formed from 2A19

d. 1054

p. 1056

a. 1059

d. 1100

Attenborough

1min Eng. Allowance

a. 1102

d. 1103

p. 1107

p. 1109

a. 1110

d. 1111

Spondon

1min Eng. Allowance

p. 1117

Derby

Diesel Power From Here
Speed Increase to 75mph
Timed for S tonnes from here

a. 1122

d. 1134

a. 1141

d. 1141

a. 1145

d. 1146

p. 1149

a. 1150

d. 1151

a. 1155

d. 1155

a. 1200

d. 1201

a. 1203

d. 1203

a. 1206

Schedule Info

Departing Thu 11/07/2024
Created Tue 23/04/24 19:40
Validity 03/06/24 until 13/12/2024
Schedule ID C60814 (9343358)
Schedule Type WTT
Duration 01 hrs 12 mins

Train Info

Operated By East Midlands Railway
Timed For 75mph
Power Type DMU
Timing Load Sprinter
Service Type Passenger Service (OO)
Service Code 22275000
Flow Info Derby - Nottingham (stopping)
Service ID 5318

Passenger Info

Member Info Log In