Operated By GNER
Lincoln
Formed from C47027
d. 2111
West Holmes Jn
p. 2113
Boultham Jn
Stops For Operating ReasonsDriver Changes Ends
a. 2115
d. 2123
Pyewipe Jn
p. 2125
Saxilby
p. 2130
Gainsborough Lea Road
p. 2139
Gainsborough Trent Jns
p. 2140
Bessacarr Jn
p. 2155
Black Carr Jn (Doncaster)
p. 2156
Potteric Carr Jn.
1min Pathing Allowance
p. 2157
Doncaster
Stops For Operating ReasonsCrew Change (if necessary)Electric Power From HereSpeed Increase to 125mphTimed for 800 tonnes from here
a. 2202
d. 2225
Sand Bank Junction
p. 2227
Doncaster Carr Iep Depot
a. 2230
Schedule Info
Train Info