Train 5N33 Sunderland to Heaton T&R.S.M.D.

Operated By GNER

d. 2337

Brockley Whins

2min Pathing Allowance

p. 2343

Pelaw Jn.

1min Eng. Allowance

p. 2349

High Level Bridge Jn

1min Pathing Allowance

p. 2354

Newcastle

Stops For Operating Reasons
Driver Changes Ends
Electric Power From Here
Speed Increase to 125mph
Timed for 800 tonnes from here
Joins with C47018

Plat 4 SL

a. 2357

d. 0008

p. 0014

Schedule Info

Departing Wed 04/09/2024
Created Mon 19/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID C46857 (8784625)
Schedule Type WTT
Duration 00 hrs 41 mins

Train Info

Operated By GNER
Timed For 100mph
Power Type DMU
Timing Load Class 800
Service Type Empty Coaching Stock (ECS) (EE)
Service Code 21704001
Flow Info East Coast Empty Coaching Stock Movements
Member Info Log In