Train 5P82 Hornsey E.M.U.D. to Peterborough

Operated By Thameslink, Runs Only If Required

d. 1103

Harringay Up Rev Sdgs

Driver Changes Ends

a. 1105

d. 1114

SL1

p. 1118

p. 1120

p. 1126

Welwyn Garden City

2min Pathing Allowance

p. 1130

p. 1133

p. 1135

Stevenage

1min Pathing Allowance

p. 1137

p. 1140

Arlesey

Stops For Operating Reasons

a. 1145

d. 1145

Biggleswade

Stops For Operating Reasons

a. 1150

d. 1151

Sandy

Stops For Operating Reasons

Plat 2 SL

a. 1154

d. 1155

St Neots

Stops For Operating Reasons

a. 1201

d. 1202

Huntingdon

Stops For Operating Reasons
1min Eng. Allowance

Plat 3 SL

a. 1209

d. 1210

Holme Jn.

Stops For Operating Reasons

FL

a. 1220

d. 1221

p. 1225

Peterborough

Then Forming 5E82

a. 1228

Schedule Info

Departing Thu 28/03/2024
Created Thu 09/11/23 21:20
Validity 11/12/23 until 31/05/2024
Schedule ID C05921 (7799698)
Schedule Type WTT
Duration 01 hrs 25 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 387
Service Type Empty Coaching Stock (ECS) (EE)
Characteristics Driver Only Operated (DOO)
Runs as required
Service Code 21788001
Flow Info GN Empty Coaching Stock Movements
Member Info Log In