Train 9R50 Gatwick Airport to Bedford

Operated By Thameslink

d. 1656

p. 1659

a. 1704

d. 1706

p. 1712

a. 1714

d. 1715

South Croydon

1min Pathing Allowance

a. 1718

d. 1719

East Croydon

1min Pathing Allowance

a. 1722

d. 1723

p. 1725

p. 1726

p. 1730

Bricklayers Arms Jn

1min Performance Allowance

p. 1734

p. 1736

a. 1738

d. 1741

Metropolitan Jn

1min Performance Allowance

p. 1742

p. 1745

a. 1746

d. 1747

a. 1748

d. 1749

a. 1750

d. 1751

St Pancras International

Electric Power From Here
Speed Increase to 100mph
Timed for 700 tonnes from here
1min Performance Allowance

a. 1755

d. 1756

p. 1758

p. 1800

p. 1801

p. 1805

Radlett Jn

1min Pathing Allowance

SL

p. 1810

St Albans City

3min Pathing Allowance

a. 1817

d. 1818

p. 1825

a. 1826

d. 1827

Luton Airport Parkway

1min Eng. Allowance

a. 1832

d. 1833

a. 1836

d. 1837

a. 1840

d. 1841

p. 1842

a. 1845

d. 1846

Flitwick

1min Performance Allowance

a. 1849

d. 1850

Bedford South Jn.

1min Eng. Allowance

DSL

p. 1858

Bedford

Then Forming 9T61

a. 1902

Schedule Info

Departing Wed 10/07/2024
Created Tue 20/02/24 20:43
Validity 03/06/24 until 13/12/2024
Schedule ID G54444 (8829678)
Schedule Type WTT
Duration 02 hrs 06 mins

Train Info

Operated By Thameslink
Timed For 100mph
Power Type EMU
Timing Load Class 700
Service Type Express Passenger (XX)
Characteristics Driver Only Operated (DOO)
Service Code 22729000
Flow Info Thameslink

Passenger Info

Member Info Log In